SUS304 part

Description

Processed with CNC.
Heat treatment: solution treatment.
Ordinary water channel valve body, the internal water holes are U-shaped, and the through holes are sealed by welding process.

Delivery time is about 15 days.

Packed with suitable packing material for air or sea transporation.